Glenfield STP

Two span shade structures 20 x 20m each were installed for a Sydney Water treatment plant. Shading was needed to reduce the incidence of tank contamination from algae, leaves and birds and improve the efficiency of pumps and the treatment processing. The neatness of the structures hide the intricacies of the shaping needed.

FABRIC: Monotec Koonunga Shade Cloth

Steel Framework: Gal Steel

Project Size: 800 sm

Head Builder or Architect: Leightons

2010

Previous Page
  • test
  • test
  • test
  • test